1 00:00:07,970 --> 00:00:06,530 we've been extremely busy here at map 2 00:00:10,400 --> 00:00:07,980 over the last few months we actually 3 00:00:13,039 --> 00:00:10,410 have parts for e-m1 on the floor but we 4 00:00:14,570 --> 00:00:13,049 also have all of our well confident 5 00:00:16,490 --> 00:00:14,580 articles have been welded and are 6 00:00:18,769 --> 00:00:16,500 sitting out on the floor we also have 7 00:00:21,500 --> 00:00:18,779 our qualification article sitting out on 8 00:00:23,990 --> 00:00:21,510 the floor also we have a dome a stone 9 00:00:26,330 --> 00:00:24,000 and a forward dome all of the rings that 10 00:00:28,040 --> 00:00:26,340 are needed for m1 are produced and 11 00:00:29,810 --> 00:00:28,050 sitting on the floor waiting to be 12 00:00:31,220 --> 00:00:29,820 machines factory readiness here to 13 00:00:33,290 --> 00:00:31,230 Michoud assembly facility has been 14 00:00:34,970 --> 00:00:33,300 progressing in fact even accelerating 15 00:00:36,770 --> 00:00:34,980 since the initial completion of the 16 00:00:38,990 --> 00:00:36,780 vertical assembly center at this point 17 00:00:40,819 --> 00:00:39,000 we have our well Darius up and going we 18 00:00:42,619 --> 00:00:40,829 have tape processing areas to the point 19 00:00:44,479 --> 00:00:42,629 where the control systems and tooling is 20 00:00:46,459 --> 00:00:44,489 being in place one aspect of the tank 21 00:00:47,660 --> 00:00:46,469 processing areas is all new control 22 00:00:49,850 --> 00:00:47,670 rooms they're going to be managing 23 00:00:52,610 --> 00:00:49,860 electrical requirements interlocks feeds 24 00:00:54,740 --> 00:00:52,620 and propellants and primers and TPS 25 00:00:56,660 --> 00:00:54,750 brace adjacent to these assembly and 26 00:00:58,099 --> 00:00:56,670 integration areas is the engine shop the 27 00:00:59,299 --> 00:00:58,109 Indians will come over from Stennis 28 00:01:01,040 --> 00:00:59,309 Space Center they'll be checked out 29 00:01:02,599 --> 00:01:01,050 carefully and will actually install them 30 00:01:04,880 --> 00:01:02,609 here at Michoud as we walk through the 31 00:01:06,830 --> 00:01:04,890 factory today we have world-class robots 32 00:01:09,260 --> 00:01:06,840 doing all types of manufacturing and 33 00:01:11,420 --> 00:01:09,270 assembly operations one of the aspects 34 00:01:12,920 --> 00:01:11,430 of tank processing is a proof testing 35 00:01:15,109 --> 00:01:12,930 for both the liquid oxygen and liquid 36 00:01:16,910 --> 00:01:15,119 hydrogen tanks those areas are all but 37 00:01:18,620 --> 00:01:16,920 complete the tooling is on its way in 38 00:01:20,870 --> 00:01:18,630 control systems are being checked out 39 00:01:22,460 --> 00:01:20,880 another really important aspect is we're 40 00:01:24,620 --> 00:01:22,470 bringing a lot more skilled technicians 41 00:01:26,179 --> 00:01:24,630 on this coming year already in place are 42 00:01:28,490 --> 00:01:26,189 the welders and the weld engineers 43 00:01:30,230 --> 00:01:28,500 joining them will be planners and folks 44 00:01:31,640 --> 00:01:30,240 working all the tank processing areas 45 00:01:33,679 --> 00:01:31,650 and then of course the assembly